Schedule Of Condition Reports

Protecting Property Owners, Landlords &
Tenants Across Surrey and the South East

A Schedule of Condition Report is one of the most effective ways to protect your property interests before a lease begins, before construction works start, or before any potentially damaging activity takes place nearby. At DAW Surveyors, we prepare detailed, independent Schedule of Condition Reports as RICS Chartered Surveyors, helping landlords, tenants, developers and property owners avoid costly disputes and unexpected repair liabilities. If you are entering into a commercial lease, planning refurbishment works, or concerned about neighbouring construction, a professionally prepared Schedule of Condition provides clear, dated evidence of a property’s condition at a specific point in time.

What Is a Schedule of Condition?

A Schedule of Condition (SoC) is a comprehensive written and photographic record of the condition of a property at the date of inspection.

It documents:

  • Structural elements (walls, floors, ceilings)

  • External elevations and roof coverings (where accessible)

  • Windows and doors

  • Finishes and decorative condition

  • Fixtures and fittings

  • External areas, boundaries and hardstanding

  • Any existing defects such as cracks, dampness, settlement or wear and tear

The report provides objective evidence that can be relied upon if disputes arise later.

Without a Schedule of Condition, responsibility for defects or deterioration can become unclear — particularly in leasehold or construction scenarios.

When Do You Need a Schedule of Condition Report?

1. Before Signing a Commercial Lease

One of the most common reasons to instruct a Schedule of Condition Report is before entering into a commercial lease agreement.

Many leases require tenants to:

  • Keep the property in repair

  • Put the property into repair

  • Return it in “good and substantial repair”

Without a Schedule of Condition attached to the lease, a tenant could become liable for pre-existing defects — even if those defects were present before occupation.

A Schedule of Condition limits repairing liability to the documented condition at the start of the term. This can protect tenants from substantial dilapidations claims at lease expiry.

For landlords, it also provides clarity and avoids later disputes.

2. Before Construction or Development Works

If building works are planned either:

  • On your property, or

  • On neighbouring land

A Schedule of Condition can protect against claims for alleged damage.

This is particularly important where:

  • Excavations are planned

  • Basement works are being carried out

  • Extensions are proposed

  • Heavy machinery will be used

  • Scaffolding will be erected

The report provides a defensible record should allegations of cracking, movement or other damage arise during or after works.

3. Before Party Wall Works

Although separate from a formal Party Wall Award, a Schedule of Condition is often prepared as part of the Party Wall process to record the adjoining owner’s property condition before notifiable works commence.

4. Before Short-Term Licences or Occupation Agreements

Even short-term occupancies can give rise to disputes over damage or deterioration. A Schedule of Condition ensures expectations are clear from the outset.

Why Instruct an RICS Chartered Surveyor?

A Schedule of Condition must be:

  • Accurate

  • Thorough

  • Objective

  • Professionally prepared

  • Supported by clear photography

  • Legally robust

At DAW Surveyors, we are regulated by the Royal Institution of Chartered Surveyors (RICS), meaning:

  • We follow recognised professional standards

  • We carry appropriate Professional Indemnity Insurance

  • Our reports are prepared independently and impartially

  • Our advice is based on technical building expertise

An inadequately prepared report can undermine your position in a dispute. A detailed inspection by an experienced surveyor ensures nothing important is missed.

What Does Our Schedule of Condition Include?

Our reports typically contain:

✔ Detailed Written Description

Clear commentary on the condition of each building element, noting defects, deterioration and areas of concern.

✔ High-Resolution Photographic Record

Time-stamped images cross-referenced within the report.

✔ Element-by-Element Breakdown

External and internal elements recorded systematically.

✔ Clear Identification of Existing Defects

Cracking, dampness, structural movement, spalling brickwork, timber decay and other issues carefully documented.

✔ PDF Report for Legal Attachment

Prepared in a format suitable for attaching to leases or legal agreements.

The Risks of Not Having a Schedule of Condition

Failing to obtain a Schedule of Condition can result in:

  • Costly dilapidations claims

  • Disputes between landlord and tenant

  • Claims for alleged structural damage

  • Difficulty proving pre-existing defects

  • Unnecessary legal fees

  • Strained commercial relationships

In commercial property matters, the cost of a Schedule of Condition is small compared to the potential financial exposure without one.

Schedule of Condition for Commercial Leases

Commercial tenants often underestimate their repairing obligations. Many leases are drafted in a way that can unintentionally increase liability.

We regularly work with:

  • Retail tenants

  • Office occupiers

  • Industrial and warehouse operators

  • Medical and professional practices

  • Landlords granting new leases

We can also liaise with your solicitor to ensure the Schedule of Condition is properly referenced within the lease wording.

Schedule of Condition for Residential Properties

While more common in commercial settings, residential property owners may require a Schedule of Condition:

  • Before major renovation works

  • Before neighbouring extensions

  • For high-value rental properties

  • For dispute prevention between adjoining owners

We provide clear, concise and practical reports tailored to the level of risk involved.

Our Process

  1. Initial Enquiry
    Contact DAW Surveyors with property details and intended purpose.

  2. Fee Proposal
    We provide a clear, fixed fee quotation.

  3. Site Inspection
    A detailed inspection is carried out by an experienced RICS Chartered Surveyor.

  4. Report Preparation
    A comprehensive written and photographic report is compiled.

  5. Issue of Final PDF
    Suitable for legal attachment or formal record keeping.

We aim to provide prompt turnaround times to avoid delaying lease completions or construction start dates.

Why Choose DAW Surveyors?

  • RICS Chartered Surveyors

  • Experienced in both commercial and residential property

  • Independent and impartial advice

  • Detailed, thorough reporting

  • Professional service tailored to your circumstances

  • Serving Surrey and the South East

We understand the technical and legal importance of getting this document right.

Frequently Asked Questions

How much does a Schedule of Condition cost?

Fees depend on property size, complexity and purpose. We provide fixed fee quotations following initial details.

How long does the inspection take?

Typically between 1–3 hours depending on the property size and access arrangements.

Is a Schedule of Condition legally binding?

The report itself is evidence of condition. Its legal effect depends on how it is referenced within a lease or agreement. We recommend your solicitor ensures it is properly incorporated.

Can it prevent a dilapidations claim?

It can significantly limit liability by clearly documenting condition at lease commencement.

Get a Quote for a Schedule of Condition

If you are about to:

  • Sign a commercial lease

  • Grant a new tenancy

  • Start building works

  • Undertake excavation or structural alterations

Speak to DAW Surveyors today. A professionally prepared Schedule of Condition Report could save you substantial costs and stress in the future.